Within the framework of the project of the German Society for International Cooperation GIZ, 20 modular boiler houses were delivered to different regions of Ukraine (Sumy, Mykolaiv, Chernihiv, Odesa regions). The boiler houses are equipped with 2 pellet boilers with weather-dependent regulation and a full set of technological equipment. The modular boiler house of quick […]
More
The project involved the reconstruction of heating networks in the villages of Demydiv and Katyuzhanka (2 facilities) from boiler houses to consumers. The pipelines were completely replaced and the heat chambers and inputs to the buildings were reconstructed.
More
Within the framework of the project, project documentation was developed and three boiler houses of the Dymer territorial community were reconstructed, namely: Boiler house of Demydivskaya Secondary School on Fastova Street 1 – reconstruction of facades, installation of chimneys, wiring of technological equipment, installation of accumulator tanks for solid fuel boilers, installation of automatic control. […]
More
Within the framework of the project, eight boiler houses of the Borodyanka community were reconstructed. In six of them, namely the village of Druzhnia, the village of Nova Hreblya, Nove Zalissia, the village of Shybene, the village of Kachaly, a complete reconstruction of internal networks and replacement of technological equipment (boilers, circulation pumps, etc.) was […]
More
The project envisages overhaul of the premises (finishing of facades, replacement of the roof, replacement of windows and doors, cosmetic repair of the interior) completion of the warehouse. AOGV-100 gas boilers were also replaced with automated solid fuel ones, and technological equipment was installed.
More
As part of the reconstruction, the old AOGV gas boilers were replaced with automated solid fuel brands RETRA. New technological equipment and chimneys have been installed. The premises were repaired with the replacement of windows and gates. Domestic premises are arranged.
More
Supply of a complete modular boiler room (building, solid fuel boilers, technological equipment, chimneys) and connection on site.
More
Completion of the boiler room, installation of solid fuel boilers, technological equipment and chimneys
More
Replacement of gas boilers with solid fuel (fuel – chicken) and installation of new chimneys
More
Installation of an individual heating point according to an independent connection scheme with a hot water circuit to meet the needs of heat and hot water of Dzvinochok school in Myrhorod
More
Within the framework of the ENERGODIM program of the Energy Efficiency Fund, the reconstruction of the input unit was carried out with the installation of an individual heating point with weather-dependent regulation.
More
The project provided for the complete replacement of the heating system (pipelines, risers, radiators) of the educational complex and the installation of an individual heating station
More
Installation of 54 individual heating points in residential buildings in Zhytomyr
More
Laying of heating networks from pre-insulated pipes of the residential district in Chernivtsi
More