Realized objects

Supply of 20 modular boiler rooms within the framework of the GIZ project

Within the framework of the project of the German Society for International Cooperation GIZ, 20 modular boiler houses were delivered to different regions of Ukraine (Sumy, Mykolaiv, Chernihiv, Odesa regions). The boiler houses are equipped with 2 pellet boilers with weather-dependent regulation and a full set of technological equipment. The modular boiler house of quick […]

More

Reconstruction of heating networks in the Dymer community as part of the NEFCO project to restore critical infrastructure in affected regions

The project involved the reconstruction of heating networks in the villages of Demydiv and Katyuzhanka (2 facilities) from boiler houses to consumers. The pipelines were completely replaced and the heat chambers and inputs to the buildings were reconstructed.

More

Reconstruction of boiler houses in the Dymer community as part of the NEFCO project to restore critical infrastructure in affected regions

Within the framework of the project, project documentation was developed and three boiler houses of the Dymer territorial community were reconstructed, namely: Boiler house of Demydivskaya Secondary School on Fastova Street 1 – reconstruction of facades, installation of chimneys, wiring of technological equipment, installation of accumulator tanks for solid fuel boilers, installation of automatic control. […]

More

Reconstruction of boiler houses of the Borodyanka community within the framework of the NEFCO project to restore critical infrastructure in affected regions

Within the framework of the project, eight boiler houses of the Borodyanka community were reconstructed. In six of them, namely the village of Druzhnia, the village of Nova Hreblya, Nove Zalissia, the village of Shybene, the village of Kachaly, a complete reconstruction of internal networks and replacement of technological equipment (boilers, circulation pumps, etc.) was […]

More

Supply of modular automated solid-fuel boiler rooms within the framework of the German Society for International Cooperation Giz program

More

Overhaul of the boiler house of Vasylkiv Secondary School of I-II grades, Lokhvytsia territorial community

The project envisages overhaul of the premises (finishing of facades, replacement of the roof, replacement of windows and doors, cosmetic repair of the interior) completion of the warehouse. AOGV-100 gas boilers were also replaced with automated solid fuel ones, and technological equipment was installed.

More

Reconstruction of the boiler room of Tokariv Secondary School of I-III grades, Poltava region, Myrhorod district

As part of the reconstruction, the old AOGV gas boilers were replaced with automated solid fuel brands RETRA. New technological equipment and chimneys have been installed. The premises were repaired with the replacement of windows and gates. Domestic premises are arranged.

More

Supply and installation of a modular boiler house for heating of the Sviridov branch of the Lokhvytsia gymnasium №1

Supply of a complete modular boiler room (building, solid fuel boilers, technological equipment, chimneys) and connection on site.

More

Reconstruction of the warehouse with the completion of the boiler room for heating of Lokhvytsia gymnasium №3

Completion of the boiler room, installation of solid fuel boilers, technological equipment and chimneys

More

Reconstruction of the boiler house of Orlyatko school in Lokhvytsia

Replacement of gas boilers with solid fuel (fuel – chicken) and installation of new chimneys

More

Installation of an individual heating point in the Dzvinochok school in Myrhorod

Installation of an individual heating point according to an independent connection scheme with a hot water circuit to meet the needs of heat and hot water of Dzvinochok school in Myrhorod

More

Establishment of IНP within the ENERGODIM program of the Energy Efficiency Fund

Within the framework of the ENERGODIM program of the Energy Efficiency Fund, the reconstruction of the input unit was carried out with the installation of an individual heating point with weather-dependent regulation.

More

Installation of an individual heating station and replacement of the heating system in the Volochysk NEC within the framework of the project of financing the Ukrainian-Finnish Trust Fund

The project provided for the complete replacement of the heating system (pipelines, risers, radiators) of the educational complex and the installation of an individual heating station

More

Reconstruction of input nodes (installation of IНP) in residential buildings in Zhytomyr

Installation of 54 individual heating points in residential buildings in Zhytomyr

More

Laying of heating networks in Chernivtsi within the framework of the NEFCO project

Laying of heating networks from pre-insulated pipes of the residential district in Chernivtsi

More